top of page

Search


Emily Trask
Jul 26, 20161 min read
Drilex in Willimantic, CT
#throwbacktuesday About Drilex Drilex Environmental was established in 1995 and is one of New England’s fastest growing, premier, full...
55 views0 comments


Brad Brock
Jun 23, 20161 min read
Stearns Tavern Site Groundbreaking
Stearns Tavern Site Groundbreaking - historic building in Worcester is a step closing to moving to it's new location. Courtesy: Worcester...
22 views0 comments

Brad Brock
Jun 18, 20162 min read
Worcester to host groundbreaking for move of historic Stearns Tavern
FOR IMMEDIATE RELEASE MEDIA CONTACT: John Hill, 508-799-1175 Worcester – City Manager Edward M. Augustus announced today that the city...
28 views0 comments


Brad Brock
May 5, 20162 min read
Drilex is Hiring Drillers and General Laborers!
Drillers Needed Drillers needed for a well-established drilling firm in central Massachusetts, Drilex Environmental. While experience in...
43 views0 comments


Emily Trask
Apr 13, 20161 min read
On the Job with Drilex Environmental
Drilex Environmental is a full-service drilling firm with expertise in all phases of environmental and geotechnical drilling, Chem/Ox...
282 views0 comments


Brad Brock
Mar 4, 20161 min read
VTrans Project in Readsboro, VT
Photos from the extensive VTrans project in Readsboro, VT. Drilex Environmental was established in 1995 and is one of New England’s...
23 views0 comments


Brad Brock
Feb 12, 20161 min read
Bedrock Cores from VTrans Drilling Project
Five foot cores of bedrock core from Readsboro, VT drilling project performed for the Vermont Agency of Transportation (VTrans). Rock...
22 views0 comments


Brad Brock
Feb 5, 20161 min read
Standard Penetration Test (SPT)
The Standard Penetration Test (SPT) is a widely used in-situ dynamic penetration test that involves using a SPT hammer to drive a split...
31 views0 comments


Brad Brock
Jan 29, 20161 min read
Drilex's Chris Hogan, Driller and Master Fisherman
Great catch! Drilex Environmental was established in 1995 and is one of New England’s fastest growing, premier, full service drilling and...
40 views0 comments


Brad Brock
Jan 28, 20161 min read
Drilex Involved with Stearns Tavern Move
Great news report from Worcester News Tonight about the local, Worcester-area companies, including Drilex, working together on the...
22 views0 comments


Brad Brock
Jan 27, 20161 min read
Many Hands Pull for Stearns Tavern Move
We're so pleased to be able to part of this project! "It's a lot like a Colonial-era barn raising project when everyone chips in." Check...
15 views0 comments


Brad Brock
Jan 8, 20162 min read
Tight Fit? We Can Handle It!
Tight fit? No matter what the space limitations, we can handle it! Here we had to use a crane to move our 2006 CME-55LC into place! Our...
11 views0 comments


Brad Brock
Dec 18, 20152 min read
Drilex's Reconditioned Geoprobe 6620DT
Our reconditioned 2006 Geoprobe 6620DT is a state of the art direct push machine mounted onto a rubber track unit. Its wide tracks and a...
8 views0 comments


Brad Brock
Nov 22, 20151 min read
Drilex's Alex Mercado
We're so proud of one of Drilex's longest-term and loyal employees Alex Mercado! He is a boxer who is training to hopefully make the...
8 views0 comments


Brad Brock
Nov 20, 20151 min read
Drilex Conducting Test Borings
Drilex Environmental conducting test borings down to an existing drain line to test its condition on I 93 in Sanbornton, NH. Drilex...
1 view0 comments


Brad Brock
Nov 18, 20151 min read
Tough Drilling!
Drilex Environmental was established in 1995 and is one of New England’s fastest growing, premier, full service drilling and...
3 views0 comments


Brad Brock
Nov 13, 20151 min read
Geotechnical Drilling Project
Geotechnical drilling project performed in New Ipswich, NH in the fall of 2015. Drilex Environmental was established in 1995 and is one...
8 views0 comments


Brad Brock
Nov 9, 20151 min read
Drilling a Soil Boring for Injection Well
Drilling a soil boring for injection well installation at the former Naval Air Station in South Weymouth, MA. Drilex Environmental was...
6 views0 comments


Brad Brock
Oct 22, 20151 min read
Drilex Drilling Geotechnical Bridge Boring in VT
Drilling a 200-plus-foot Geotechnical bridge boring in Rockingham, VT. Forty feet of casing had to be lowered through a hole cored in the...
2 views0 comments
Emily Trask
Oct 2, 20152 min read
Drilex Has the Drilling Equipment You Need
At Drilex, we have a wide range of equipment to ensure we have the right machine to get your job done. Our wide range of drilling and...
14 views0 comments
bottom of page